The full public announcement of the environmental protection acceptance monitoring report of Dongying Hebang Chemical Co., Ltd.'s environmental protection and energy conservation comprehensive utilization technical transformation (incinerator) project (Ph

2024.11.25

According to the requirements of the "Regulations on Environmental Protection and Management of Construction Projects" (State Council Order No. 682), the "Interim Measures for Environmental Protection Acceptance of Construction Projects Completion" (Guo Environmental Regulations [2017] No. 4), the "Dongying Hebang Chemical Industry" is now on The environmental protection acceptance monitoring report for the completion of the environmental protection acceptance of the technical transformation (incinerator) project (Phase II) of the Co., Ltd. is announced as follows:

      Construction unit: Dongying Hebang Chemical Co., Ltd.

      Project name: Environmental protection and energy conservation comprehensive utilization technical transformation (incinerator) project (stage 2)

      Construction location: west of Donggang Road and north of Gangbei 1st Road in Dongyinggang Chemical Industrial Park, within the existing factory area of Dongying Hebang Chemical Co., Ltd.

      Public announcement content: acceptance report and acceptance opinions (see attachment for details)

      Public announcement date: November 25, 2024-December 20, 2024 (20 working days)

      During the public announcement period, the public may contact our unit by letter, call or other means for relevant information, and put forward relevant opinions and suggestions, respond to the questions and leave contact information so that we can respond to feedback in a timely manner.

      Contact: Li Qishuai

      Contact number: 0546-7710820

      Email: hbhuanbao@hebangchenmical.com

      Conclusion of the acceptance group: Acceptance monitoring and on-site verification, this project complies with national industrial policies and environmental protection policies. The pollutant emission concentrations of all the projects meet the requirements of the corresponding standards. This project has complete environmental protection procedures, basically implements all environmental protection requirements in the environmental impact assessment approval, and meets the conditions for environmental protection acceptance of the completion of the construction project. The waste gas, wastewater and noise can meet the standards for discharge, the solid waste is disposed of reasonably, and the project meets the completion acceptance conditions in terms of environmental protection. The acceptance team unanimously believes that this project can pass the completion environmental protection acceptance.

      Acceptance monitoring report and opinion announcement link:

      Link: http://www.shandongwode.com/xinwenzhongxin/110.html

                                                                                                                                                                                                                      Dongying Hebang Chemical Co., Ltd.

                                                                                                                                                                                                                             November 25, 2024